AegisOps Offshore · By Aspire Fox Ltd

Protecting People. Protecting Power.

Daily operational planning for offshore wind — every decision visible, every plan owned by a human.

A daily planning tool for offshore wind O&M, built on a transparent rules engine.

Planning board · Fox Windfarm · Tomorrow · Synthetic
COR-1472Pitch system faultAllocated
COR-1480Converter cooling alarmAllocated
INS-0219Statutory lift inspectionDeferred
COR-1466Yaw brake replacementBlocked
The problem

Failures planned in, not caused offshore.

At the deskA constraint is missed at planning.
→
OffshoreA sail fails, or works can't complete.
→
ReturnTechnicians come back, opportunity lost, works incomplete.
→
CostLost time, cost and production.

The information existed. The plan missed it. Controllable — every time.

Forecasts shift, and viable conditions are the technicians' call at the asset. But most failed sails aren't weather calls gone wrong — they're controllable things that should have been caught at the desk: the wrong team composition, a lapsed GWO ticket, a davit out of use, a part not loaded. While planning lives in spreadsheets and in people's heads, oversights are inevitable.

Why now

Offshore wind can no longer absorb lost days.

Fleets are larger, older and under tighter production and contractual pressure.
Recovery and commissioning throughput now carries board- and regulator-level visibility.
Operators are actively sourcing software to protect every working day.
What it is

One plan, every constraint connected.

Inputs
techniciansvesselsturbinesthresholdstasksweather
→
Rules engineEvery decision traceable to a rule
→
Daily planA priority task queue with crew and vessel
→
IssuedPlan locks; pre-sail briefs generated at issuance; outcomes captured at debrief

AegisOps recommends. A named planner approves and issues. Nothing goes to the team without a human owning it.

Visible reasoning

Every decision, traceable to a rule.

AegisOps flags. The planner decides.

COR-1472 · W4-T07Critical
Pitch system fault
AllocatedLead: WT4 · CTV slot 06:40
Why this task?
→Lead chosen — highest first-time-fix rate on pitch-related faults.
→Prioritised — production-loss exposure of £12.4k/day.
→Scheduling confirmed — crew, vessel slot and weather window all runnable.
"I've worked turbines across every kind of site, every access method, and every phase of their life — and built that judgement into the engine. A moat you can't reach from a developer's desk."
Thomas Fox · Director
Roadmap

Beyond the day.

Today AegisOps plans the day and sketches the day after. The roadmap extends the same rules to the horizons above it.

ROADMAPAnnual programme planningROADMAPCampaign and statutory inspection schedulingROADMAPContractual production prioritisation
ISO 9001 · 14001 · 45001 — certified
ISO 27001 — in progress
Processor, not controller
No individual performance ranking — by design

Now seeking our first pilot partner.

A fixed-scope pilot. One site. Ninety days. Success criteria defined together before we start.